Own railway siding with 2 tracks: up to 34 platforms and simultaneous handling of up to 10 wagons
Own railway siding on the territory of the complex
2 dedicated railway tracks
About 700 meters of track in total
Up to 34 platforms placed at a time
Feeding and handling of up to 10 wagons simultaneously
Direct transloading wagon-to-warehouse and wagon-to-truck
Wagon loading and unloading by the complex staff
4 904 m²
Total warehouse building area
Total warehouse building area
-18°/-25°
Storage temperature mode
Storage temperature mode
5 rooms
of ~500 m² each
of ~500 m² each
700 m own railway siding
24/7 Security and video surveillance
8 loading docks with dock levellers
Electric forklifts
1250 kVA substation + 500 kW diesel generator

